Showing posts with label Schools. Show all posts
Showing posts with label Schools. Show all posts

Sunday, October 30, 2011

Restoration-A Team Sport (Why Seismic Terror Threatens Buildings)

There is a discussion, on one of the professional historic preservation listservs, that asks the question “Is the Architect the most important person in a restoration?”  The answers, including my own, tend toward “that depends on the architect” with the general consensus being that a good architect is a valuable element of the team, but the wrong architect can ruin a historic building.  I’ve met both of those architects (My architect friends know that long ago I started to characterize architects as being either “trainable” or beyond redemption.  I don’t work with the latter more than once).

But it is another professional member of the team who can often be more critical to the success of a project, if only because they can either make or break it long before the rest of us even get to start thinking about it.  That would be the structural engineer, a position that has risen in importance in Oregon in direct proportion to the rise in concern over seismic activity and the so-called “Big One,” that we are now taught to call the Cascadia Event.

The general public (read building owners and, unfortunately, too many building officials) tend to get really nervous about the structural integrity of “old” structures that don’t meet current building codes.  (We won’t mention that the building you are sitting in right now, unless it was built last month, probably doesn’t meet current building code either).  Well-meaning people tend to think “non-code compliant” and “unsafe” are somehow synonyms.  They aren’t.


So, why am I writing this?  Well, engineer issues are always at the forefront of project planning and, since I have several projects in that phase, I’ve been dealing with engineers.  Good ones are creative, experienced, and flexible.  The opposite, not quite so much.  Whatever I think about architects beyond redemption, I think about the wrong engineers to an exponential degree.  They can kill a project, and they can do so entirely unnecessarily.  Other times (read school districts) public officials use seismic concerns (founded or not) as an excuse for what they really what to do (See the Medford School District and the demolition of both Jackson and Roosevelt elementary schools a few years ago).

The building community, particularly in this poor economy, has a tendency to beat the drum of public safety related to unreinforced masonry buildings.  I don’t think that this entirely self-serving, but I also don’t buy that it’s the crisis it is sometimes made out to be.  You can retrofit most any building fairly economically to help assure that people will get out in the event of an “event” and, of course, any time you work on a building you should take the opportunity to improve its structural capacity.  But the reality is that you can only rarely save the building without incredible, unsupportable, expense.  And that is pretty much a good thing because it is the rare building (historic or otherwise) that really can justify that expense or merits saving.  Historic buildings are cool, no doubt.  But perhaps investing millions into them just to cover your hindquarters from a lawsuit isn’t the best use of capital. 

I was just involved with the planning for a police station, a building you probably want to survive an event, right?  The current, old, wood-frame, building had 1 in 158 probability of collapse during an earthquake.  Moving that use into another, significantly newer and more expensive building, would yield a probably of 1 in 31,600.  Pretty good odds.  But 1 in 158 isn’t all that terrible a starting point. And what NO engineer will ever actually tell you is that there is no such thing as an earthquake proof building.  That city, for considerably less money, will upgrade its existing facility and increase its survival by more than a factor of ten.  Better odds.  An economic study of the cost per life saved from 500 government mandated programs found that seismic upgrade to existing buildings was the single least cost-effective use of dollars.  Not much comfort, of course, if you are injured by a falling building, but perhaps from a policy standpoint those millions and millions of dollars would be better spent improving the safety of our cars and roads.  There is little doubt that it would save more lives.

Given the chance, one of my first recommendations to any client is to be sure they have all the right professionals in place; the architect, the contractor, and the engineer as early in the process as is possible so that each of us can communicate to each other.  It doesn’t always work, but it sure tends to work better than not.

Sunday, October 16, 2011

Steamline Moderne-Architecture on the Move

Medford's SOHS History Center, built as a J.C. Penney Co. Department store
 Streamline Moderne architecture, roughly popular from the mid-1930s to the early 1950s, was an effort to integrate the design sensibility of the so-called “Machine Age” with architecture and new technologies.  Owing much of its inspiration to industrial designers like Walter Dorwin Teague and Raymond Lowey, who transformed everything from trains to toasters into works of art, Streamline Moderne is often linked with Art Deco (another indistinct term) but in reality is much different.  Whereas Deco was often flamboyantly, well, decorated, Streamline is the architecture of the wind tunnel, the machine.  The best examples of the style have rounded corners, smooth, usually stucco, surfaces, portal-type windows or large banks of glass block.  In the day, Streamline Moderne owned more to the design of cars and planes.  It was architecture of movement, that looked like it was going somewhere, a characteristic that once caused Frank Lloyd Wright to famously respond to a question of his own lack of interest in the style by stating that when “HE” built something, it stayed put.



Moderne, achieving popularity during the Depression and continuing into the postwar period, was adopted for an entire host of new building types linked to technology.  As a result, I run into them often and have always rather been fond of the style.  Many of the early Control Houses and related buildings of the Bonneville Power Administration were designed in Streamlined Moderne and those that remain are textbook examples of industrial architecture looking for new forms to house new, and “modern” technology, as shown at the Covington Untanking House.  Gas stations were also often built in the style, as in Walter Dorwin Teague's famous designs for Texaco.  The three lines at the cornice are literally called "speed lines," as shown in this fine example from La Grande, Oregon.

I’ve always had a mild desire to write a book on Streamline, which gets short shrift in most architectural histories and is in and of itself the subject of just a few studies of any quality.  Often lumped with, and always over-shadowed by Art Deco (which, let’s face it, makes for better images) or even WPA-Moderne, Streamline Moderne is often mis-understood and little appreciated or just confused with other styles. 

Last week, on my way along the Gorge toward eastern Oregon, I drove around The Dalles and stumbled across their absolutely amazing high school, completed by an architect unknown in 1941.  It’s a great great building....certainly worth more than few photos.





Wednesday, December 16, 2009

Medford's West School

In 1884, within a year of founding their city, the citizens of Medford passed a tax levy to construct the city’s first public school. Later known as West School (presumably after they built another school building to the east), Medford’s house of education was a fine two story wood frame building with interesting stick detailing on the exterior and a belltower on the top. It stood on Oakdale, near Main street, where the Jackson County Courthouse stands today.



In 1891 Medford decided to build a new school building on the site (a brick structure that would be known as Washington Elementary). Local businessman A. A. Davis, president of the Medford Roller Mill, purchased the school building and moved it to a lot on 10th Street, near Oakdale, behind the Catholic Church. Davis, a wealthy landowner, entirely remodeled the old school as his residence, stripping off the belltower and building a fine two-story Temple Front porch as the entry. To the east he had a porte cochere, a covered driveway, built to create a dignified appearance.

After Davis, the house was occupied by another pioneer family, the Alfords, and then during WWII was transformed into an apartment complex, the “Colonial Arms.” It remained as apartments, falling on harder and harder times, until 1976 when two attorneys purchased the place and decided to transform it into offices. Their major remodel was longer on heart than quality but the building housed a host of professional uses including the Britt Festival administration, before it was purchased by Sacred Heart Catholic Church, for use as the church offices.



Today, 40 years after the well-intentioned remodel, the wood siding is failing, woodpeckers have discovered the place, and the non-insulated walls and ceilings are creating huge heating and cooling bills. We are working on some specifications to guide a major rehab project, replacing the poor 1976 siding with new material after installing wall cavity insulation, shear, and better venting. The windows will be rebuilt and improved, some bad design decisions will be corrected and, all-in-all, the building will get a new, and improved, lease on life. Think of it as the 120-year tune up.

Wednesday, September 16, 2009

Jackson and Roosevelt, a sad situation in retrospect

A comment on another posts asks "what's up with the photos of Jackson School?" that run in the sidebar. Two years ago I was involved with an unsuccessful effort to save the historic Jackson and Roosevelt school buildings in Medford. These schools, built in 1911 and each a landmark anchor in a neighborhood named after them, were both built of brick with fine entry details. Neglected, and much added onto over the years, they were in need of work but had, as we say, "good bones." And they were both loved by many and were classic examples of that dying breed, "the neighborhood school."

The School District, 549C, and Dr. Phil Long, their superintendent, had secured $189 million in bond funding from the generous voters of Medford, promising to rebuild these structures, along with major improvements to most of the other schools and construction of a new high school to replace South. In the Summer of 2007, the day after school closed, 549C summarily closed both Jackson and Roosevelt, claiming that the brick was faulty and beyond repair, creating a eminent hazard to children. This was, frankly, a lie. They had no testing upon which to base that claim and in my discussions with Dr. Long about the issue he blandly admitted that the District simply didn't want to operate a three-story building. "They just don't work for us, as a school," he told me.


In typical political machination, still without any testing, 549C came up with a silly retrofit cost from an engineer unfamiliar with structural rehab. I have never seen so much concrete and steel inserted into a structure without reason in my career. What a surprise the costs were far more than demolition and new construction. Then they announced that cost over-runs at the new high school would require that neither Jackson or Roosevelt ever be rebuilt. (Funny, but that was their original goal, before election polling showed that the bond wouldn't pass if Jackson and Roosevelt were eliminated. Parents in both those neighborhoods, assured that their schools would be retained, hit the streets and got out the vote. The bond request passed by a mere 300 or so more "yes" votes than "no.")

The group that I was involved with, Save Medford Schools, shifted (wisely) to fight to keep schools on the Jackson and Roosevelt sites as the neighbors were promised. I continued to push for release of the brick study (which I had pushed 549C to commission during the Summer, but which 549C refused to publish...guess why?) and accurate cost justification that showed rehab was more expensive than demo and rebuild. Of course, the day they released the brick study, which of course found the bricks were fine, they also announced a new plan to rebuild Jackson and Roosevelt anyway, with money that came from their over-estimate of the repair of North High School. This effectively split the opposition, with parents who just wanted a neighborhood school on one side afraid to make any more waves and preservationists and fiscally minded community number-crunchers on the other, knowing that the District had cooked the numbers to get what they wanted to begin with.

Both Jackson and Roosevelt are now the site of new, two-story, buildings that will be opened next year. "Flagship High," as the monstrous suburban collector school the District is building at the edge of town has come to be known, is nearly complete. It fails to provide adequate theater and sport facilities, meaning the District will have to retain and maintain South to make it work and that students will have to drive or be bussed back and forth between the campuses (it is too far to walk).



The entire episode, as I testified to the 549C Board in January 2008 was a violation of the public trust, a waste of public funding, and the most egregious example of mismanagement on the part of an elected body I have ever been associated with in more than 25 years of public involvement. Had I been a Medford resident I would have led an effort to recall all of them, but not being so, I was effectively characterized as a "butt-inski" from Ashland.

The photos are of Jackson, in better days and during demolition. This week the Medford Landmark and Historic Preservation Commission announced its intent to nominate Washington School to the National Register. Dr. Long is 'considering' whether to support their effort. I am not holding my breath.